RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN >> 2004, Vol. 13 >> Issue (2): 101-108.

• Contents •     Next Articles

ECOLOGICAL AND ENVIRONMENTAL MONITORING PLANS AND PROTECTION MEASURES FOR LARGE-SCALE HYDROPOWER PROJECTS

HUANG Zhen-li   

  • Received:1900-01-01 Revised:1900-01-01 Online:2004-03-20
  • Contact: HUANG Zhen-li

Abstract: Based on a brief introduction of environmental policy of the World Bank on the hydropower project, this paper summarized respectively the longterm ecoenvironmental monitoring plans and the measures for reducing the side effects caused by the four famous hydropower stations (Egypt's Aswan High Dam, Brazil's Itaipu Dam, China's Ertan Dam and Three Gorges Dam). A hydropower project is of negative or positive impacts on the environment in related regions and the negative impacts of largescale dams as mentioned above are focused on. The Egypt's Aswan High Dam was constructed in 1960s while the ecoenvironmental impact issues were not arose. After its completion, the Egypt's High Dam had been praised as the mainstay of Egyptian economy and vilified as an environmental catastrophe. Longterm ecoenvironmental monitorings have shown that a lot of environmental impacts such as bed erosion had been exaggerated and a few such as traditional brick making industry ignored. The Brizil's Itaipu Project had taken measures to reduce the side effects while under construction, including measures for forest area conservation surrounding the reservoir, biological shelters and nature reserves construction, animal rescue centers etc. China's Ertan Project supported financially by the World Bank had carried out the environmental policy to reduce the side effects. By sharing the experiences of largescale hydrpower projects, a series of measures to protect the environment are being implemented for the ongoing Three Gorges Project, in which the largest ecoenvironmental monitoring network has been set up.

Key words: hydropower project, ecoenvironmental monitoring, Aswan Project, Itaipu Project, Ertan Project, Three Gorges Project

[1] WANG Qi, OU Fu-ping, ZHANG Lei, LU Shao-yong. CHANGES OF WATER ENVIRONMENT IN DONGTING LAKE AND ITS IMPACT ANALYSIS AFTER THE THREE GORGES PROJECT OPERATION [J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2015, 24(11): 1843-1849.
[2] ZHANG Xinbao, CAO Zhijing,AI Nanshan. POTENTIAL IMPACT OF SEDIMENT RETAINING BY XILUODU HYDROPOWER PROJECT TO THE EUTROPHICATION OF THREE GORGES RESERVOIR [J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2009, 18(2): 170-.
[3] XU Junjie, HE Qing, LIU Hong, CHEN Jiyu. PRELIMINARY ANALYSIS OF CHARACTERISTICS OF THE EXCEPTIONAL LOW DISCHARGE AND ITS CAUSE OVER THE YANGTZE RIVER|2006 [J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2008, 17(5): 716-716.
[4] HUANG Guo-an,XIONG Xin-kang. ANALYSIS OF THE THREE GORGES PROJECT'S INFLUENCE ON ECONOMICAL DEVELOPMENT OF HUBEI PROVINCE [J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2004, 13(2): 114-118.
[5] XIAN Wei-wei,LIU Rui-yu,LUO Bin-zheng. ENVIRONMENT OF THE CHANGJIANG ESTUARY BEFORE THE SLUICE CONSTRUCTION IN THE THREE GORGES RESERVOIR [J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2004, 13(2): 119-123.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
[1] ZHANG Zheng, FU Rongbing, YANG Haizhen, GU Guowei. COMPARISON OF ORGANIC MATTER REMOVAL IN SUBSURFACE |HORIZONTAL FLOW WETLANDS BASED ON WATER BUDGET [J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2007, 16(3): 363 .
[2] ZHANG Qiang. CHANGING CHARACTERISTICS OF SEDIMENT YIELD AND DISCHARGE DURING PAST 40 YEARS IN CATCHMENT OF THE YANGTZE RIVER[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2008, 17(2): 257 .
[3] YUAN Xuyin. CHARACTERISTICS OF MAJOR AND TRACE ELEMENTS IN CONTAMINATED RIVERS AND THEIR SIGNIFICANCE[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2008, 17(2): 270 .
[4] XU Su-fang, ZHOU Yin-kang. EVALUATION ON THE SUSTAINABILITY IN LAND USE OF DEVELOPMENT ZONE——A CASE STUDY IN WUHU ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2006, 15(4): 453 -457 .
[5] HAO Hanzhou,JIN Menggui,CAO Lijing,XIE Xianjun. APPLICATION OF FUZZY MATHEMATICS IN WATER QUALITY ASSESSMENT[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2006, 15(Sup1): 83 -87 .
[6] ZHANG Qi-cheng,YAO Yi-feng,JIANG Cheng-yu. FUNCTION EVOLVEMENT AND MODERN LANDSCAPE PLANNING OF NANJING URBAN WATERFRONT[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2004, 13(1): 30 -34 .
[7] HU Hong-xing, KANG Hong-li, GONG Guo-hong, ZHU Mi-hui5,ZHENG Wen-qin5,WU Fa-qing, HE Ding-fu, LI Zhen-wen, GENG Dong5. BIODIVERSITY OF WINTER WATERBIRDS IN HUBEI,CHINA[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2005, 14(4): 422 -428 .
[8] LIU Yao-bin,LI Ren-dong. ANALYSIS ON REGIONAL DISPARITY OF ECONOMIC DEVELOPMENT IN HUBEI PROVINCE FROM 1994 TO 2000[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2004, 13(1): 12 -17 .
[9] CHEN Yong-bo. EFFECT OF THE THREE-GORGE PROJECT(TGP) ON THE SUSTAINABLE DEVELOPMENT IN THE YANGTZE BASIN[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2004, 13(2): 109 -113 .
[10] WENG Junshan, DUAN Ning,ZHANG Ying. PHYSICAL AND CHEMICAL CHARACTERISTICS OF ATMOSPHERIC PARTICLES IN SHUANGQIAO FARM, JIAXING CITY[J]. RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2008, 17(1): 129 .