长江流域资源与环境 >> 2009, Vol. 18 >> Issue (11): 1014-.

• 自然资源 • 上一篇    下一篇

安康水库分级超蓄的洪水资源化方法及其风险

刘 招1| 黄 强2| 原文林2| 乔长录1   

  1. (1.长安大学水与发展研究院| 陕西 西安 710064; 2.西安理工大学西北水资源与环境生态教育部重点实验室| 陕西 西安 710048)
  • 出版日期:2009-11-20

GRADING DYNAMIC CONTROL ON RESERVOIR WATER LEVEL IN FLOOD SEASON AND ITS APPLICATION ON ANKANG RESERVOIR

LIU Zhao1, HUANG Qiang2, YUAN Wenlin2, QIAO Changlu1   

  1. (1.Research Institute of Water and Development of Chang’an University, Xi’an 710064, China|2.Key Lab of Northwest Water Resources and Environment Ecology of the Ministry of Education at Xi’an University of Technology, Xi’an 710048, China)
  • Online:2009-11-20

摘要:

汛限水位动态控制是水库洪水资源化的一种重要策略,其核心是在合理权衡风险和效益这一对矛盾的基础上确定可行的水库超汛限水位调度方案。为实现相对较大效益的同时降低水库防洪风险,考虑利用流域降雨预报信息,采用预泄能力约束法,以不同的降雨预报量级为依据,提出分级超蓄的洪水资源化方法,并结合安康水库实例,求得其基于 24 h 小雨和无雨预报的分级超蓄上限分别为326 m和 328 m。通过风险分析得知:在不考虑降雨预报信息的情况下,水库超蓄上限不宜超过 327.5 m;而依据 24 h 降雨预报信息的水库超蓄风险小到可以忽略。最后,应用该超蓄方案对实际洪水进行调度,实现了在减少弃水量069亿m3的同时,增加发电收入约361万元人民币.

关键词: 水库调度/洪水资源化/ 分级超蓄/ 风险

Abstract:

Dynamic control of the limit water level is one of effective strategy to utilize floodwater resources,which key problem is to work out a feasible over storage operation scheme based on rational weighing the contradictory of risk and interest.For more benefits and lower risk,precipitation forecast information was taken into account in this paper,and a method of 〖JP2〗grading of flood control level for floodwater〖JP〗 resource utilization was put forward based on predischarge capability constraint method.Then,the method was applied to Ankang reservoir for flood water resource utilization,the grading control water level was 326 m and 328 m respectively by calculation when the 24hourforecast rain intensity was 0.1 mm to 10 mm and 0.1 mm below.Furthermore,risk analysis indicates that the flood control level could not be over 327.5 m in the case of without regard to precipitation forecast information,but the risk could be ignored if 24hourforecast precipitation was taken into account.Finally,the scheme was applied to Ankang reservoir for a real flood operation,the benefit analysis indicates that it will bring about 361 thousands RMB of extra power generation interests at the same time cutting abandoned water 69 million m3.Therefore, it is proved that the application of the method has favorable effects not only on risk control but also on benefits increment in floodwater utilization.

Key words: reservoir operation/ floodwater resources utilization/ grading of flood , control level/ risk analysis

No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!