RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN >> 2012, Vol. 21 >> Issue (01): 71-.
• Contents • Previous Articles Next Articles
LONG Haifeng, XIONG Lihua, WAN Min
Online:
Abstract: From the DEM data of Shuibuya catchment in the Qingjiang River upstream basin,the digital river network was extracted,the basin boundary was delineated,and the topographic index distribution of this region was calculated.A DEMbased distributed hydrological model (DDRM),which was proposed by Xiong et al.(2004),was applied to simulate the rainfallrunoff processes in the study region.The simulation results of the DEMbased distributed model were compared with that of the Xinanjiang River model in terms of the NashSutcliffe coefficient of efficiency,the relative errors of both peak flow and the total runoff amount.The conclusion can be drawn that the DEMbased distributed hydrological model performs as well as the Xinanjiang River model.The Xinanjiang River model,in terms of the total runoff amount simulation,is slightly better than the DDRM.When it refers to the NashSutcliffe coefficient of efficiency,the two models resemble each other.However,in simulation of peak flow and the time it appears,the DDRM shows a litter better result.Compared with the Xinanjiang River model,the DEMbased distributed hydrological model has advantages of simple structure,parsimonious parameters,and concise description of physical process.Besides,the DEMbased distributed model has the ability to simulate the spatial distribution of soil water storage and runoff amount.
LONG Haifeng, XIONG Lihua, WAN Min. APPLICATION OF DEMBASED DISTRIBUTED HYDROLOGICAL MODEL IN QINGJIANG RIVER BASIN[J].RESOURCES AND ENVIRONMENT IN THE YANGTZE BASIN, 2012, 21(01): 71-.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://yangtzebasin.whlib.ac.cn/EN/
https://yangtzebasin.whlib.ac.cn/EN/Y2012/V21/I01/71
Cited