长江流域资源与环境 >> 2010, Vol. 19 >> Issue (05): 560-.

• 生态环境 • 上一篇    下一篇

建坝对下游河道水文情势影响RVA评价方法的改进

杨 娜1| 梅亚东1| 尹志伟2   

  1. (1.武汉大学水资源与水电工程科学国家重点实验室| 湖北 武汉 430072; 2.温州市水文站| 浙江 温州 325000)〖
  • 出版日期:2010-05-20

IMPACT ASSESSMENT OF DAMS ON THE FLOW REGIME OF LOWER RIVER BY IMPROVED RVA

YANG Na1| MEI Yadong1| YIN Zhiwei2   

  1. (1.Key State Laboratory of Water Resources and Hydropower Engineering Science| Wuhan University| Wuhan 430072| China; 
    2.Wenzhou Hydrological Station| Wenzhou 325000| China)〖
  • Online:2010-05-20

摘要:

研究水库下游河道中水文情势的变化是研究水利工程对河流生态系统胁迫的一种新途径。RVA(Range of Variability Approach)方法基于32个参数从水流的等级、频率、历时、发生时间、变化率5个方面的水文特征对建坝后河道水流情势的变化进行定量分析,并给出各个参数确定的满足河道生态要求的流量特征变化范围。将该方法运用于位于浙江省飞云江上的珊溪水库,以其下游的峃口水文站为观测点,分析了该站52a的日流量资料,计算出了河道水流参数满足生态系统要求的可控制范围。并在原RVA评价各参数水文变化度的基础上进行了改进,利用改进的方法对32个参数的变化情况以及整个河流水流情势的变化情况进行了评价。通过与原方法的比较,结果表明改进后的RVA方法更为客观。根据计算结果,建坝后该河流的整体水流情势变化度为中度,流量的频率和历时指标变化最大,低流量事件的持续时间减少,出现次数增多,严重影响了河流的生态功能

Abstract:

Study on the changes of flow regime in the lower reach of dams provides a new way to research the river ecosystem stress coming from hydraulic engineering.Based on 32 hydrological parameters,RVA(Range of Variability Approach)quantified the changes of flow regime and gives the range of variability to control the flow,while the flow was characterized by five characters such as magnitude,frequency,duration,timing and rates of change.However,the estimation part of the RVA performed impropriate in some situation,for that reason,a new estimation way was proposed in the paper.The improved method was applied to Shanxi reservoir built on Feiyun River,and the daily flow data were obtained from the Xuekou hydrological station dated from 1956 to 2007.The flow variability range of the lower reach of Shanxi reservoir was calculated and the change degree was evaluated.By comparing the flow of predam to postdam,the 32 parameters of postdam all changed,among which the frequency and duration changed mostly.The improved estimation method performed better in determining the change range,and the estimation value showed that the river flow was moderate changed after the dam built.The change was mainly reflected on the shorter duration and more frequency of low flow event,which severely affected the river ecosystem.

No related articles found!